| The Challenge | |
|---|---|
| Emergency callout for a burst pipe in a Wembley family home. Water damage throughout the ground floor, with flooding affecting kitchen and living areas. Customers needed immediate response to prevent further damage. | |
| Our Solution | |
| Arrived within 45 minutes, isolated the water supply, replaced the damaged pipe section with quality materials, and coordinated with drying specialists. Complete repair with no future issues. | |
| Response Time | Total Cost |
| 17 min | £285 |
| Completion | |
| 3 hrs | |
| The Challenge | |
|---|---|
|
Victorian terrace house in Finchley needed complete interior refresh. Walls showed years of wear, outdated color scheme, and preparation work required for uneven surfaces typical of period properties. |
|
| Our Solution | |
|
Full preparation including filling, sanding, and priming. Applied two coats of premium paint throughout. Modern neutral palette chosen to complement period features while creating bright, contemporary living spaces. |
|
| Response Time | Area Covered |
| 27 min | 8 Rooms |
| Completion | |
| 5 Days | |
| The Challenge | |
|---|---|
|
Modern apartment in Canary Wharf required a complete flooring upgrade. The old carpet was worn and unsuitable for contemporary space. Client wanted premium wood flooring throughout three bedrooms and hallway. |
|
| Our Solution | |
|
Removed existing carpet, prepared subfloor surface, and installed engineered oak flooring with professional finishing. Included skirting board replacement and seamless transitions between rooms. |
|
| Response Time | Total Area |
| 37 min | 85m² |
| Completion | |
| 3 Days | |

